Presence

  1. Chitaenergo – Renovation of Verkhnyaya Davenda 110/35/6 kV substation with expansion of a 110 kV switchgear and bringing the 110 kV OSG layout to standard
  1. Kalugaenergo – Upgrade/establishment of an energy metering system with remote data acquisition
  2. Kalugaenergo – Krutitsy 110 kV substation (Renovation of OSG 110 kV)
  3. Kalugaenergo – Kvan 110 kV substation, Azarovo 110/35/10 kV substation (Renovation of 110 kV OSG)
  4. Kalugaenergo – FEED Renovation of Protva 110/35/10 kV substation, with replacement of power transformers
  5. Construction of Kotovo 220 kV substation
  6. Construction of Mirnaya 220 kV substation
  7. Global renovation of Sputnik 220 kV substation
  8. Kalugaenergo – Renovation of Protva 110/35/10 kV substation with replacement of power transformers
  1. Kostromaenergo – Pavino 110/35/10 kV substation (retrofitting C&I operations)
  2. Kostromaenergo – Upgrading of telecontrol systems, active networking equipment at nine 110 kV substations
  3. Kostromaenergo – C&I of relay protection and automation, APMS, telecontrol & cable networks at 35-110 kV substation, APMS development program for 28 substations
  4. Kostromaenergo – Upgrade/establishment of an energy metering system with remote data acquisition
  1. Kurskenergo – Upgrade/establishment of an energy metering system with remote data acquisition
  1. PJSC RZD – Production of a multi-turn attachment prototype for placing and securing of semi-trailers at platform cars
  2. ZAO NPP Energia – Delivery of electric bus charging stations
  3. Kovdor MPP, Murmansk Region – Delivery of a cold-proof containerized substation, type KTPM-630/10/0.4
  4. PJSC ENEL branch, Konakovskaya GRES – Delivery of steel structures to the 500 kV OSG
  5. PJSC FGS UES, Valdai MPTL entity – Delivery of steel structures
  1. JSC Polytechstroy – arrangement of 10 kV power grids Chertanovo-Severnoye
  2. Nasledie LLC – Polytechnic Museum, Moscow — Arrangement of electricity supply to power and low-current networks
  3. Nasledie LLC – School electrification
  4. Nasledie LLC – Carryover of 2 cable lines (10 kV) Chertanovo Severnoye
  5. Moscow MPTL entity of FGS UES – FEED adjustment of Radishchevo 220 kV substation
  6. Construction, installation, and commissioning on the site: UAC headquarters in Zhukovsky, Moscow Region
  1. Oryolenergo – FEED construction of a FOCL-based backbone communications network in Oryol, for 12 substations (110 kV)
  2. Pishchevaya 110 kV substation – Oryol CHPP Sovetskaya 110 kV substation – Zapadnaya 110 kV substation Zapadnaya 110 kV substation – Uzlovaya 220 kV substation, (C&I on alteration of Oryolenergo’s backbone communications network (FOCL)
  3. Oryolenergo – Renovation of engineered safety features at Kromsky distribution zone and Kromskaya 110/35/10 kV substation
  4. Oryolenergo – Upgrading of telecontrol system at Khlebprodukty 35/10 kV substation
  1. C&I in renovation of 10/0.4 kV networks, urban locality Kaa-Khem, for JSC Tyvaenergo, No. 18.2-11/2.1-0003
  1. Ryazanenergo – Renovation of a substation (Replacement of ABs) (FEED)
  2. Ryazanenergo – Renovation of Zaborye 110 kV substation (Installation (replacement) of ground fault neutralizers) (FEED)
  3. Ryazanenergo – Renovation of a 110/10 kV substation (Replacement of an accumulator battery and chargers)
  4. Ryazanenergo – Renovation of Teatralnaya 110 kV substation
  5. Ryazanenergo – Renovation of Likhachevo 110/10 kV substation
  6. Ryazanenergo – Renovation of Oka 110 kV substation with replacement of Т-1, Т-2 2х16 MVA for 2х2.5 MVA, with installation of two 10 kV package OSG cubicles (FEED)
  7. Ryazanenergo – Installation (replacement) of ground fault neutralizers at Dyagilevo 110/10/6 kV substation
  1. Smolenskenergo – FEED for renovation of battery unit at Safonovo 110/6 kV substation and Roslavl 110/35/6 kV substation
  2. Smolenskenergo – FEED for control curr. controller installation at Melkombinat 35/10 kV substation
  3. Smolenskenergo – C&I for fitout of automated access control & monitoring systems at 25 facilities
  4. Smolenskenergo – Retrofitting of Roslavl 110/35/6 kV substation with replacement of a DC control current battery unit
  1. Tambovenergo – FEED for upgrading of 35-110 kV OHL in Tambov distribution zone, Stage I, with a FOCL common suspension (100 km) via incoming line to 110 kV substation: Promyshlennaya, Tambovskaya 2, Tambovskaya 3, Tambovskaya 8; 35 kV substation: Komsomolskaya, Seleznevskaya, Avangardskaya, Timiryazevskaya, Bokinskaya, P. Prigorodnaya; Network control center as part of establishing a digital distribution zone
  2. Tambovenergo – Making of telecontrol packages at Gorelskaya 35 kV substation, Tatanovskaya 35 kV substation, Chernyanovskaya 35 kV substation, Kulevatovskaya 35 kV substation, Otyasskaya 35 kV substation
  3. Tambovenergo – Upgrading of telecontrol systems at Rasskazovskaya 110 kV substation, N. Lyadinskaya 110 kV substation Spasskaya 110 kV substation, Arzhanskaya 110 kV substation, M. Talinskaya 110 kV substation (C&I and Comm for upgrading of telecontrol systems)
  1. Tulenergo – C&I on renovation of Yakovlevo 110/10 kV substation No. 322 with replacement of 10 kV package OSGs (2 pcs)
  2. Tulenergo – Upgrading the ground loop at Gurovo 35/6 kV substation and Krushma 110/10 kV substation
  3. Tulenergo – FEED, C&I on renovation of Ushatovo 110/35/10 kV substation
  4. Tulenergo – Renovation of Tsentralnaya 110/10 kV substation
  5. Tulenergo – Renovation of Gurovo 35/6 kV substation, Borisovo 35/10 kV substation
  6. Tulenergo – renovation of oil sumps at Trunovo 110/35/10 kV substation and Barsuki 110/35/6 kV substation
  1. TverZhilDorstroy LLC – Renovation of Zatveretskaya-Sominka 35 kV OHL
  2. Svetotekhnika Plant of Likhoslavl LLC – Replacement of a switchgear SG-0.4 kV, TS No. 5
  3. PJSC FGS UES, Valdai MPTL entity – documentation development, construction and installation, commissioning, Andreapol 220 kV substation
  4. Bezhetskselmash Plant PO – Testing of electrical equipment, testing and measuring relay protection and automation at a 110/10 kV substation
  5. Tverenergo – Retrofitting of Vagzhanovskaya 35/6 kV substation with replacement of control current batteries due to their technical condition
  6. Tverenergo – Retrofitting of Rameshki 110/35/10 kV substation to the extent of a battery replacement
  7. Konakovskaya GRES, a branch of PJSC Enel – Renovation of OSG-500 kV
  8. Tverenergo – Upgrade/establishment of an energy metering system with remote data acquisition
  9. Tverenergo – FOCL construction – Yuzhnaya 110 kV substation Brusovo 110/35/10 kV substation, N. Rozhok 110/35/10 kV substation, Rameshki 110/35/10 kV substation, Tuchevo 110/35/10 kV substation
  10. Tverenergo – Renovation of Sholmino 110/35/10 kV substation
  11. Tverenergo – Repairs of Moshki 35/10 kV substation, Lisitsky Bor 35/10 kV substation, Ilinskoye 35/10 kV substation, Selikhovo 35/10 kV substation
  12. Tverenergo – Repairs of Spirovo-Novaya 110 kV OHL, Kaliniskaya-Severnaya-2 110 kV OHL, Lazurnaya-Substation No.13 35 kV OHL, Zavolzhskaya-Severnaya 1 35 kV OHL, Severnaya-Sominka 35 kV OHL
  13. Tverenergo – Renovation of Trud 110/35/10 kV substation
  14. Tverenergo – FEED for DATS program: Ostashkov 110 kV substation, upgrade of ADCS
  15. Tverenergo – Repairs of Zapadnaya Dvina – Ulin 35 kV OHL, Rameshki – Kiverichi 35 kV OHL with a branch line to Dievo substation
  16. Tverenergo – Repairs of Ulanovo 35/10 kV substation, Proletariy 35/10 kV substation, RMK 35/10 kV substation, Steklozavod 35/10 kV substation
  17. Tverenergo – Upgrading of telecontrol at Verkhnyaya Troitsa 110 kV substation
  18. Tverenergo – Renovation of Turginovo 35/10 kV substation and a 10 kV distribution network
  19. Tverenergo – Proletarskaya 110 kV substation, Yuzhnaya 110 kV substation, Mamulino 110 kV substation. (DATS installation)
  20. Construction of Doroshikha 110 kV substation FEED for renovation of Mamulino 110/10 kV substation
  21. Tverenergo – Renovation of Mamulino 110/10 kV substation, construction of a 10 kV distribution substation, a 10/0.4 kV package containerized transformer substation, a 10 kV aerial cable line, a 0.4 kV cable line
  1. Voronezhenergo – Upgrading of ADCS at Verkhnekhavsky and Ramonsky distribution zones
  1. Yarenergo – C&I, COMM on construction of digital communication channels from Yarenergo’s network control center to Vega 220 kV substation and to Venera 220 kV substation
  2. Yarenergo – Upgrading of telecontrol systems at a 35-110 kV substation
  3. Yarenergo – FEED for implementation of a telecontrol system at distribution station No. 62 10/0.4 kV and construction of a communications system from 2PDTS-1250/10/0.4 kV to the network control center
  4. Yarenergo – Renovation of a 10 kV ISG at Krasny Pereval 110/10 kV substation
  5. Yarenergo – Renovation of a 10 kV ISG at Severnaya 110/6/6 kV substation
  6. Yarenergo – C&I and COMM of evacuation systems, fire, fire & security alarm systems, fire warning and evacuation management systems at 29 facilities of the branch
  7. Yarenergo – Renovation of transformer substation 782 — a 6/0.4 kV SG, distribution substation 11 — a 6/0.4 kV SG, transformer substation 67 K-532 — a 0.4 kV SG

Company

Over the years in business, we have accomplished 250+ projects. Our company has in-house electrical equipment production facilities.

We have partnered with top energy companies.

MERING ENGINEERING IS:

95 professionals
95%
30 vehicles
30%
12 years of operational excellence
12%